Although the darkroom was functional, there were some issues when using it :
- The chemicals and trays were not stored near the darkroom desk (and therefore increases the setup time before I can do a single enlargement).
- Spills would go strait into the wood bench, and the workbench was not waterproof.
- Safe light position was sub optimal : it did not illuminate the trays properly, since the LED strip was laid on top of the workbench.
Renovations
![](https://jaerder.videmogroup.org/blog/wp-content/uploads/2018/11/Darkroom_001-1024x681.jpg)
![Darkroom after renovation](https://jaerder.videmogroup.org/blog/wp-content/uploads/2018/12/20181229_182810-1024x768.jpg)
![](https://jaerder.videmogroup.org/blog/wp-content/uploads/2018/12/20181229_183023-1024x768.jpg)
Darkroom after renovation , with the safe light on.